02/09/11  - The fireplace has been built and the stove pipe has been placed up through the roof.  James Dixon has installed the cabinets in the bathrooms and pantry.  He has laid the title in the bathrooms and is now finishing up the shower in the master bathroom.  Frank Lewis, the stone mason, is due back on Friday to start the stone work on the fireplace.  The kitchen cabinets will be delivered on February 17th, the appliances on February 23rd.  As soon as Frank is finished the stonework the wood floors can start going in.  The spiral staircase should be delivered sometime this week and they can go in once the floor is in place.  We are getting close and expect to get our occupancy permit in March, or at least that is our goal.
Phil Hess paints one of the guest bedrooms
Bobby Cheney cuts in around the circular 
wall in the office
This shows the window and door framing finish
Back of fireplace showing the stove pipe and 
fresh air intake
Fireplace showing stovepipe for wood stove
The electrical outlets at the bottom and mid
right have been removed
John Weimer just installed the durarock 
and is sealing it
This is the sink area in the pantry
The washer and dryer will go to the left of the cabinets.  This is still in the pantry
Lee is applying a final coat of polyurathane in the family room.
This is the scratch coat applied which will help the mortar adhere to the fireplace.
Paul is applying the scratch coat inside the wood box on the right hand side of the fireplace
Opie, Willie and Nathaniel doin' their thing...
Frank is working on the niche in the face of the chimney
Lorrie doing her lick em & stick em thing
Willie is getting the stone in the exact position he wanted it and then told me to hold 'er tight!