Our New House Construction

 
Handling 12' sheets of wallboard is heavy work
This is over the dining room windows
John King working in the opening for the spiral staircase
Close up of the above picture
This is the utility room showing the geothermal equipment being installed
One is the hot water heater the other is a supplemental unit as part of  the back-up system
The family room being closed-in
This is to the left of the previous picture
Josh taping & spackling
This is the ceiling in the family room and two of the solar tubes
The ceiling in the dining room and living room
Gary in the hole where the gas tank will be burried